Login   |   Register
  • The Great Wall Of Highland Meadows

    Published: August 18, 2021

    In 2012, an inspection of the wall revealed a lot of damage and that the wall needed a lot of work to repair that damage. No maintenance or repair work had been done on the wall since it was built. The original engineering estimate was that it would cost over one million dollars to do all the repair or rebuilding of the entire wall along Pool Road and Hall Johnson. The HMHOA Board of Directors decided to prioritize the repairs starting with the section in the worst shape. It was also decided to do the work on a pay as you go basis, only do what could be afforded out of the current year budget, and only do the necessary repairs to save money. In other words, it would be a multiyear effort with no special assessments levied for wall repair. The wall sections are numbers. Sections 1 through 4 are along Pool Road. Sections 5 through 8 are along Hall Johnson Road. Specifications and requests for proposals were sent to the following contractors asking them to bid on the multiyear wall repairs. Click Full Story for more information.

    Full story

    Highland Meadows HOA